Denis Rivière, Site Manager for KLS (CLM Pointe-Noire)

29 October 2014 by

«We definitely saved 15%, even 20% on installation costs with the Hydralfor conveyors compared to the installation of other conveyors on the Pointe-Noire project. The way the conveyors are supplied is resulting that less work is required when they are installed on site»